↓
 

Mid-Continent Railway Museum

North Freedom, Wis.

Text: Mid-Continent Railway Museum. A historical and educational experience. Images of railway cars, people, and Mid-Continent logo.
  • Home
    • Home Page
    • News
    • Join Our Email List
    • Media
  • Plan Your Visit
    • Buy Tickets
    • Train Ride/Museum Info
    • Special Events
      • Autumn Color™ Weekend
      • Pizza Limited
      • Harvest Flyer
      • Pumpkin Special™
      • Root Beer Float Flyer
      • Santa Express™/Holiday Flyer
      • Stars and Stripes Special
      • Vintage Rail Car Tours
    • Cancellation Policy
  • Gift Shop
  • Restorations
    • Major Projects
    • Steam Status
      • Overview
      • C&NW #1385 Status Updates
      • Western Coal & Coke #1 Status Updates
      • Dardanelle & Russellville #9 Status Updates
    • Car Shop
      • General Updates
      • DSS&A Sleeper DULUTH
      • EJ&S #2
      • Badger #2
      • Copper Range #25
      • MLS&W #63
      • Copper Range #60
  • Equipment Roster
    • Equipment Roster Home
    • Steam Locomotives
    • Diesel/Other Locomotives
    • Wooden Passenger Cars
    • Steel Passenger Cars
    • Wooden Freight Cars
    • Steel Freight Cars
    • Cabooses
    • Service Equipment
    • Former Collection Items
  • Resources
    • Online Archives Home
    • Wooden Car Builders
    • MCRM Newsletters
    • Gazette Archive
    • Audio Archive
    • Video Archive
    • Wallpaper
    • Kids Page
      • Kids Page
      • What Makes A Diesel Locomotive Work?
      • What Makes A Steam Locomotive Work?
  • About Us
    • Contact Us
    • About Mid-Continent
    • Board of Directors
    • Department Leaders
    • Our Staff
    • Become a Member
    • Volunteer
    • Employment
    • Tour of Grounds
    • Local History
    • Mid-Continent Timeline
    • Privacy Policy
  • Donate

Category Archives: C&NW #1385 Status Updates

Welcome to the Chicago & North Western #1385 steam status blog! Follow along as we bring the 1907 American Locomotive Company 4-6-0 steam engine back to operating condition.

Post navigation

← Older posts
Newer posts →

Washout Couplings and Plugs

Mid-Continent Railway Museum Posted on March 8, 2018 by Jeffrey LentzMarch 8, 2018

An important part of caring for a steam locomotive is time-honored boiler wash. Performing boiler washes at regular intervals is mandatory to conform with Federal Railroad Administration regulations and ensures that the locomotive’s boiler is kept free from all corrosion and scaling which would otherwise lead to reduced operating performance and eventually cause damage to the boiler. Boiler washes must be completed after every 31 days the locomotive is in service and is one of the many steps of regular maintenance required to keep a steam locomotive operating. During a wash the boiler is first emptied and then high-volumes of water are flushed through the interior of the boiler and smokebox until no sign of rust, scale or other detritus is detectable in the drainwater.

In order to perform a boiler wash, it is necessary to have numerous access points to the boiler’s interior to direct the water into the boiler as wells as locations for the drainwater to escape. This is achieved through the use of removable plugs of a decent size that can easily be removed and put back in with a steam tight seal.  SPEC Machine is reproducing steam era Huron style [Huron Manufacturing, Inc.] couplings and plugs from certified materials for the task.

washout couplings arrayed on table

New washout couplings for C&NW #1385. Pete Deets photo.

sample washout coupling and plug

New washout couplings with sample plugs from the C&NW #1385’s old boiler. Pete Deets photo.

The couplings will be welded into the boiler shell and the two plugs shown in the above photo (which are actually from the 1385’s old boiler) demonstrate how the plug sits in the coupling and also shows the wide sealing surface that makes the Huron style so easy to use.  With a clean thread and sealing surface a gentle tap or two with the heel of your hand on the end of an 18-inch wrench is all that is needed for a perfectly steam-tight fit.  Much more force than that will only distort the plug and seat and ruin the sealing surface.

bronze rods

SPEC Machine’s Steve Roudebush opens a shipment of new bronze rods which will soon be formed into washout plugs for 1385’s boiler. Pete Deets photo.

Recently the steam bronze arrived for the new plugs and was photographed being unboxed by SPEC Machine’s Steve Roudebush.  Those two sticks total over 300 lbs. of material.  The next step is to whittle away anything that doesn’t look like a Huron plug.

Engineering calculations show the threads should be able to withstand pressure up to 13 times greater than the boiler’s design pressure but calculations alone aren’t good enough. One extra coupling was made to serve a dual purpose.  First, it will be welded into a piece of test material so we can gauge how badly the heat of the welding process will distort the coupling.  The test material will also have a fitting applied to allow the 1385 team to hook it up to the hydrostatic pressure test pump.  Once a plug is made, it will be screwed into the coupling and can be pressure tested as a system to further prove the safety of the design before it gets installed on the actual boiler.

Meanwhile in St. Louis, Missouri, Continental Fabricators has continued production work on the new boiler. This photo recently shared by Continental Fabricators’ staff shows the front courses welded together.

three boiler courses welded together

Welded front courses of Chicago & North Western #1385’s new boiler. March 5, 2018. Photo courtesy Continental Fabricators.

Tagged boiler, boiler wash, washout plugs

Lots and Lots of Staybolts

Mid-Continent Railway Museum Posted on February 2, 2018 by Jeffrey LentzFebruary 2, 2018

A brief update to yesterday’s discussion on staybolts:

SPEC has received the stock to be used for C&NW No. 1385’s rigid staybolts and is cutting it to the length, engraving the heat number and drilling the tell-tale holes per Continental Fabricator’s specifications. There will be over 1000 new rigid staybolts created in all, cut to five different lengths as required by 1385’s boiler.

stack of bolts
Stock is being cut to the proper length for producing 1385’s rigid staybolts. Ed Ripp photo.
staybolt stock on floor
SPEC Machine employees work on cutting the stock to length as the first step of producing over 1000 rigid staybolts for C&NW 1385. Ed Ripp photo.

Tagged staybolts

Staybolts Help 1385’s Boiler Keep in Shape

Mid-Continent Railway Museum Posted on February 1, 2018 by Jeffrey LentzMarch 8, 2018

The Flannery Bolt Company is long gone but their products live on as their staybolt and staybolt accessories are reproduced today for projects like the Mid-Continent’s Chicago & North Western No. 1385.  In the steam era staybolt production and replacement were a regular occurrence and such parts were readily available in large quantities. Even in 2018 there are at least two shops readily producing them as a specialty item, but for the 1385 project Mid-Continent has opted to keep it local, producing them in-house at SPEC Machine where the bulk of the locomotive’s overhaul and assembly is taking place.

1385 project volunteer Pete Deets explains, “We decided to have Steve Roudebush [owner of SPEC Machine] make them as the best way to control the cost and delivery schedule.” He adds, “The bolts to go with the sleeves and caps are on the way… there are 72 flexible staybolts on the 1385 but there are also a few hundred rigid stays that will go into the boiler.”

diagram of boiler showing staybolts

The majority of the boiler is cylindrical, a naturally strong shape, but there are also some flat and irregular surfaces within the boiler too, especially around the firebox. With the intense pressures up to 250 psi inside 1385’s boiler, these surfaces would weaken, bow, and eventually fail without staybolts to support them.

The flexability afforded by a flexible staybolt is critical to maintaining the boiler’s strength while still allowing for the expansion and contraction that occurs as temperatures change from one extreme to another within the boiler.  Deets explains:

A flexible staybolt has a ball shape on one end and is threaded on the other.  The ball end fits into and will be held by the cup shape of the inside of the sleeve.  The sleeve will be welded on the outside or wrapper sheet of the boiler above the firebox. The bolt is then dropped into the sleeve and the threaded end is screwed into a threaded hole in the firebox.  The bolt is hammered or “upset” to cause it to swell into the threads and form a steam tight seal and a copper gasket is applied with the cap to seal the sleeve end.  The ball end of the bolt can actually swivel in the cup shape of the cap and it allows the firebox to move in relation to the wrapper sheet of the boiler as the engine goes down the road.  [Locomotive designers] found that allowing that slight bit of movement was better overall for the boiler than trying to hold every bit very stiff and rigid. If things were too rigid the boiler would break the staybolts anyway.  It was also noted there were fairly specific areas of a boiler that were prone to breaking stays so the Railroad Master Mechanics Committee came out with recommended patterns of placement for the flexi’s to alleviate or at least minimize the breakage.

flexible stay caps and sleeves
New flexible stay caps and sleeves were fabricated in January 2018 by SPEC Machine for C&NW 1385. The accompanying bolts are currently in production. Photo courtesy SPEC Machine.

Heat numbers are stamped onto C&NW 1385’s flexible staybolt caps. Photo courtesy SPEC Machine.

flexible staybolt cap and sleeve
Flexible staybolt cap and sleeve detail. Photo courtesy SPEC Machine.

The photos of the staybolt caps reveal a series of numbers stamped on each one. The number represents the part’s “heat number.”  That is a jargon from the steel industry as they refer to every batch of iron or steel (or any metal) that comes out of a furnace as a “heat.”

Deets elaborates on the importance of heat numbers:

That number is vital because every piece of metal that goes into the pressure retaining portion of the boiler must meet very specific requirements of physical strength, mechanical properties and chemical properties and we have to be able to prove the materials we use meet those specs.  Every batch of steel made is tested for chemistry and physical properties and is assigned a unique number.  The records of those batches made for specific applications such as boiler plate follow the steel through the finishing process of the mill and each piece is marked with the heat number and other information.  Those records are the certification that this particular batch or heat number meets this specific set of requirements and we must get a copy of and keep on file the material certifications or “certs” for short.  That heat number represents the “pedigree” of each of those parts.

The below YouTube video produced by Wasatch Railroad Contractors while working on a different locomotive restoration provides a good illustration and explanation of how flexible staybolts work.

Last but not least, SPEC Machine has also been busy finishing up more work on 1385’s brake equipment. Brand new brake heads were cast last summer (see post from Sept. 1, 2017) and are now being machined in preparation for installation.

break head machining

One of the newly cast brake heads is machined to specification. Each brake head supports one of 1385’s brake shoes.

Tagged boiler, firebox, staybolts

1385’s Boiler Assembly Underway

Mid-Continent Railway Museum Posted on January 22, 2018 by Jeffrey LentzJanuary 22, 2018

The assembly of C&NW 1385’s boiler began in earnest late last week at Continental Fabricators in St. Louis. Here are the latest photos from the shop floor, courtesy of Gary Bensman.

front flue sheet
C&NW 1385’s front flue sheet. Jan. 21, 2018. Gary Bensman photo.
backhead sheet
C&NW 1385’s backhead sheet. Jan. 21, 2018. Gary Bensman photo.

firebox wrapper sheets
C&NW 1385’s firebox wrapper sheets. Jan. 21, 2018. Gary Bensman photo.
boiler course seam
The 1385 new boiler’s 2nd course longitudinal seam ready for x-ray. Jan. 21, 2018. Gary Bensman photo.

boiler course weld
C&NW 1385 boiler’s 2nd course longitudinal welds . Jan. 21, 2018. Gary Bensman photo.
boiler course weld
C&NW 1385 boiler’s 2nd course longitudinal welds . Jan. 21, 2018. Gary Bensman photo.

boiler course weld
C&NW 1385 boiler’s 2nd course longitudinal welds . Jan. 21, 2018. Gary Bensman photo.

 

Tagged boiler, C&NW 1385, firebox, tube sheet

First Look: 1385 Boiler Courses to Begin Assembly

Mid-Continent Railway Museum Posted on January 16, 2018 by Jeffrey LentzJanuary 16, 2018

The first images are now available from the Continental Fabricators factory floor in St. Louis showing Chicago & North Western No. 1385‘s new boiler courses waiting to be assembled.

The pics are courtesy of Gary Bensman who is working at Continental Fabricators on another project at the moment. Continental reports they are moving the courses onto the set-up table this week.

 

C&NW 1385 boiler courses at Continental Fabricators. January 16, 2018. Gary Bensman photo.
C&NW 1385 boiler courses at Continental Fabricators. January 16, 2018. Gary Bensman photo.

Construction of the new boiler is anticipated to be completed in late March or early April 2018. The boiler will then be shipped to SPEC Machine in Middleton, Wis. where it will join the running gear and cab so final assembly of C&NW 1385 can begin. After reassembly is completed (estimated late 2018), the locomotive will be shipped via heavy-haul truck to Mid-Continent Railway Museum where its already-rebuilt tender awaits its arrival.

Upon its return home, 1385 won’t be quite ready to begin pulling passengers trains immediately. It will first need to go through a period of break-in runs and adjustments as well as undergo Federal Railroad Administration inspections before it is cleared to enter revenue service.

Tagged boiler, C&NW 1385

Post navigation

← Older posts
Newer posts →
QUICK LINKS
PLAN YOUR VISIT
BUY TICKETS
GIFT SHOP
DONATE
JOIN OUR EMAIL LIST
VIEW WEBCAMS

Contact Us

Mid-Continent Railway Museum
P.O. Box 358
E8948 Museum Road
North Freedom, WI 53951
Office phone: 608-522-4261
or 800-930-1385
E-mail: inquiries@midcontinent.org

Recent News

  • Help Us Cross The Finish Line With C&NW #1385’s Restoration
  • Help Us Restore Two Icons of Rail History | Two Separate $10,000 Matching Fund Challenges!
  • “All Hands on Deck” | Restoration Department Update | June 18-22, 2025
  • D&R #9 Cosmetic Restoration Update from Jason R. | May 2025
  • D&R #9 Cosmetic Restoration Update from Fletch’s Crew | June 2025
©2025 - Mid-Continent Railway Museum - Weaver Xtreme Theme Privacy Policy
↑