↓
 

Mid-Continent Railway Museum

North Freedom, Wis.

Text: Mid-Continent Railway Museum. A historical and educational experience. Images of railway cars, people, and Mid-Continent logo.
  • Home
    • Home Page
    • News
    • Join Our Email List
    • Media
  • Plan Your Visit
    • Buy Tickets
    • Train Ride/Museum Info
    • Special Events
      • Autumn Color™ Weekend
      • Pizza Limited
      • Harvest Flyer
      • Pumpkin Special™
      • Root Beer Float Flyer
      • Santa Express™/Holiday Flyer
      • Stars and Stripes Special
      • Vintage Rail Car Tours
    • Cancellation Policy
  • Gift Shop
  • Restorations
    • Major Projects
    • Steam Status
      • Overview
      • C&NW #1385 Status Updates
      • Western Coal & Coke #1 Status Updates
      • Dardanelle & Russellville #9 Status Updates
    • Car Shop
      • General Updates
      • DSS&A Sleeper DULUTH
      • EJ&S #2
      • Badger #2
      • Copper Range #25
      • MLS&W #63
      • Copper Range #60
  • Equipment Roster
    • Equipment Roster Home
    • Steam Locomotives
    • Diesel/Other Locomotives
    • Wooden Passenger Cars
    • Steel Passenger Cars
    • Wooden Freight Cars
    • Steel Freight Cars
    • Cabooses
    • Service Equipment
    • Former Collection Items
  • Resources
    • Online Archives Home
    • Wooden Car Builders
    • MCRM Newsletters
    • Gazette Archive
    • Audio Archive
    • Video Archive
    • Wallpaper
    • Kids Page
      • Kids Page
      • What Makes A Diesel Locomotive Work?
      • What Makes A Steam Locomotive Work?
  • About Us
    • Contact Us
    • About Mid-Continent
    • Board of Directors
    • Department Leaders
    • Our Staff
    • Become a Member
    • Volunteer
    • Employment
    • Tour of Grounds
    • Local History
    • Mid-Continent Timeline
    • Privacy Policy
  • Donate

Category Archives: C&NW #1385 Status Updates

Welcome to the Chicago & North Western #1385 steam status blog! Follow along as we bring the 1907 American Locomotive Company 4-6-0 steam engine back to operating condition.

Post navigation

← Older posts
Newer posts →

1385 Project in BIC Magazine

Mid-Continent Railway Museum Posted on February 27, 2019 by Jeffrey LentzFebruary 27, 2019

Continental Fabricators was recently highlighted in Business & Industry Connection magazine. In discussing current projects at Continental, boiler fabrication for US Sugar #148 and Mid-Continent’s own C&NW #1385 were highlighted as the type of specialty projects Continental is capable of tackling.

You can check out the digital edition of the magazine, which includes a photo of 1385’s boiler.

BIC Magazine’s circulation includes industry managers and executives  in the  refining/petrochemical, drilling, pipeline, marine, terminal, pulp and paper, power generation and heavy construction industries.

Tagged boiler

Preparing for Backhead Stay Installation

Mid-Continent Railway Museum Posted on February 7, 2019 by Jeffrey LentzFebruary 7, 2019

During the last week of January Continental Fabricators began installation of the 1385’s backhead diagonal braces. The backhead is the end of the boiler located within the cab and is a large, flat plate or sheet of steel that has been flanged and then welded to the wrapper sheet.  Flanging is the process of very carefully curling the edges of a sheet to meet the next piece it will be mated to.  The flanging process has been covered in previous update posts.

Much of the boiler is round, a naturally strong shape.  With areas that are flat or nearly flat the forces of nature (including steam pressure) are constantly trying to force them round and thus they require support or “staying”. Staybolts, or “stays” and braces are thus used to reinforce the area and prevent the backhead as well as the other flat areas from bowing outward when the boiler is under pressure.

firebox diagram

While installing these braces, crews at Continental Fabricators flipped the wrapper sheet/backhead assembly upside-down to facilitate easier working conditions. The first photo below shows the assembly as of the last week of January 2019 as the braces are being fitted and tack welded in place.  The tack welds are just enough to hold the braces in place so this assembly can be righted and lowered onto the firebox/mud ring assembly to check for proper clearance between the braces and the firebox.  Once Continental is satisfied with the fit-up between the pieces the wrapper assembly will once again be pulled off the firebox, inverted and the braces will receive the final welds.

upside-down wrapper sheet and backhead

Much of the backhead will be supported via staybolts connected between it and the firebox door sheet. The pictured diagonal braces are used to support the part of the backhead that does not line up with the door sheet and is instead connected to the wrapper sheet for support. This picture was taken during the last week of Jan. 2019. Photo courtesy Continental Fabricators.

A few days later during this the first full week of February, Continental’s crews had flipped the backhead/wrapper sheet assembly right-side-up again and placed it over top the firebox/mud ring assembly. The purpose of doing this is to test fit for any contact between the backhead braces and the firebox crown sheet before final welding of the braces and before the wrapper sheet/backhead assembly is welded to the firebox/mud ring assembly.  Once the two assemblies become one the installation of the staybolts can begin.

backhead
Test fitting the wrapper for proper clearance before completing backhead stay installation. Photo courtesy Continental Fabricators.
firebox and wrapper sheet detail
This photo was taken from the front of the firebox looking toward the backhead. It shows the steam/water space between the firebox/crownsheet and the wrapper sheet. Photo courtesy Continental Fabricators.

Tagged backhead, boiler, firebox, staybolts

1385’s Boiler Assembly Continues

Mid-Continent Railway Museum Posted on December 5, 2018 by Jeffrey LentzDecember 5, 2018

The following is an update on C&NW #1385’s new boiler progress comes courtesy of Continental Fabricators. Continental is the company creating the new boiler for the 1385.

The wrapper sheet has been removed and welding is complete except for the wash out plugs.

The wrapper sheet was fit to ensure all of the firebox stay locations lined up correctly then removed so that we could drill the firebox, as you can see the doorsheet is all that needs to be drilled.  After this is complete the wrapper will be fit and welded for the last time and the entire boiler assembly will be welded together, followed by stay installation.

This photo shows the test fit of 1385’s wrapper sheet and progress with drilling. Photo courtesy Continental Fabricators

View looking down the barrel of C&NW 1385’s new boiler as of late November 2018. Photo courtesy Continental Fabricators.
1385’s door sheet is the only part left to be drilled. Photo courtesy Continental Fabricators.

When the boiler is completed it will be delivered to Wisconsin where the locomotive will be assembled at the shop of SPEC Machine.

Tagged boiler, firebox

Tender Moved to Live Track

Mid-Continent Railway Museum Posted on November 12, 2018 by Jeffrey LentzNovember 12, 2018

On October 25, 2018 a team of cranes were at Mid-Continent. The cranes were primarily there to install locomotive #1256’s new wheels, but the 1385 Task Force took advantage of the presence of the cranes to move Chicago & North Western #1385’s tender to live track.

For the past five years, ever since arriving from the fabrication shop, the 1385’s tender has resided on an isolated display track along the passenger platform. The covered platform display area provided a cozy home for the tender where the public could learn more about the restoration while the locomotive itself was overhauled off-site.

All photos courtesy Richard Colby.

With the boiler nearing completion and reassembly of the locomotive’s major components set to begin in the coming months, it was a good time to also prepare the tender for the locomotive’s eventual return.

Volunteers and members of the crane crew set about removing the tender from the shelter. First it was chained to the museum’s Lull forklift and towed out into the open where the crane could get at the tender to disassemble it. The trucks were then moved to the museum mainline and the tender reassembled. Once done, Mid-Continent’s yard switch engine, MCRY #4, coupled on and took the tender to the museum’s Engine House.






The tender, mostly while mostly complete, still has some finishing touches needed including items such as the air brake system, steam heat pipes, and electrical systems (for reversing headlight, class lights, safety lights, etc.) The wheels will also need to be jacked and the roller bearings inspected for possible damage from the August floodwaters.

 

Tagged tender, trucks

New Boiler Photos

Mid-Continent Railway Museum Posted on November 2, 2018 by Jeffrey LentzNovember 2, 2018

Continental Fabricators has supplied three new photos showing the current state of progress on  Chicago & North Western #1385’s new boiler construction.

C&NW 1385’s new boiler firebox end. Oct. 31, 2018.

C&NW 1385’s boiler, front view. Oct. 31, 2018.
C&NW 1385’s boiler, side view. Oct. 31, 2018.

Tagged boiler, firebox

Post navigation

← Older posts
Newer posts →
QUICK LINKS
PLAN YOUR VISIT
BUY TICKETS
GIFT SHOP
DONATE
JOIN OUR EMAIL LIST
VIEW WEBCAMS
Live view of North Freedom depot

Contact Us

Mid-Continent Railway Museum
P.O. Box 358
E8948 Museum Road
North Freedom, WI 53951
Office phone: 608-522-4261
or 800-930-1385
E-mail: inquiries@midcontinent.org

Recent News

  • Montana Western #31 – Winton Engine Restoration Has Been Successfully Completed
  • “Last Spike” Ceremony
  • Engine House Track #2 Update
  • 1385 Steam and Air Line Installation/Donation Update
  • #1385 Cab, Smoke Stack, and Hand Rail Installation/Donation Update
©2025 - Mid-Continent Railway Museum - Weaver Xtreme Theme Privacy Policy
↑