↓
 

Mid-Continent Railway Museum

North Freedom, Wis.

Mid-Continent Railway Museum logo banner with images of train cars and people.
  • Home
    • Home Page
    • News
    • Join Our Email List
    • Media
  • Plan Your Visit
    • Buy Tickets
    • Train Ride/Museum Info
    • Special Events
      • Autumn Color™ Weekend
      • Pizza Limited
      • Harvest Flyer
      • Pumpkin Special™
      • Root Beer Float Flyer
      • Santa Express™/Holiday Flyer
      • Stars and Stripes Special
      • Vintage Rail Car Tours
    • Cancellation Policy
  • Gift Shop
  • Restorations
    • Major Projects
    • Steam Status
      • Overview
      • C&NW #1385 Status Updates
      • Western Coal & Coke #1 Status Updates
      • Dardanelle & Russellville #9 Status Updates
    • Car Shop
      • General Updates
      • DSS&A Sleeper DULUTH
      • EJ&S #2
      • Badger #2
      • Copper Range #25
      • MLS&W #63
      • Copper Range #60
  • Equipment Roster
    • Equipment Roster Home
    • Steam Locomotives
    • Diesel/Other Locomotives
    • Wooden Passenger Cars
    • Steel Passenger Cars
    • Wooden Freight Cars
    • Steel Freight Cars
    • Cabooses
    • Service Equipment
    • Former Collection Items
  • Resources
    • Online Archives Home
    • Wooden Car Builders
    • MCRM Newsletters
    • Gazette Archive
    • Audio Archive
    • Video Archive
    • Wallpaper
    • Kids Page
      • Kids Page
      • What Makes A Diesel Locomotive Work?
      • What Makes A Steam Locomotive Work?
  • About Us
    • Contact Us
    • About Mid-Continent
    • Board of Directors
    • Department Leaders
    • Our Staff
    • Become a Member
    • Volunteer
    • Employment
    • Tour of Grounds
    • Local History
    • Mid-Continent Timeline
    • Privacy Policy
  • Donate

Category Archives: C&NW #1385 Status Updates

Welcome to the Chicago & North Western #1385 steam status blog! Follow along as we bring the 1907 American Locomotive Company 4-6-0 steam engine back to operating condition.

Post navigation

← Older posts
Newer posts →

Brake-ing News

Mid-Continent Railway Museum Posted on July 18, 2018 by Jeffrey LentzJuly 25, 2018

The braking system for Chicago & North Western #1385 consists of an iron shoe pressed against the steel wheel.  The shoes are held by the brake head and held on the brake head by a key. The brake head is attached to the brake beams and through a system of levers and hangers the brake beams get their motion and power from compressed air applied to the brake cylinders.

The brake heads on the 1385 were worn out so we ended up having a pattern made and getting new brake heads cast from steel.  Project volunteer Pete Deets got a couple photos of Steve machining the last head to fit the curvature of the brake shoe.  There are also a couple of shots of the key, head & shoe on the bench.

Steve R. of SPEC Machine machines a new brakehead to proper dimensions. Pete Deets photo.
Machining one of 1385’s brakeheads. Pete Deets photo.

Cutting fluid is sprayed onto the work area to assist with the process. Pete Deets photo.
The newly machined brake head next to one of 1385’s brake shoes. Pete Deets photo.

The brake head gets secured to the brake beam (not shown). Pete Deets photo.
The curved brake shoe fits the curvature of the wheel and applies force against the wheel during braking. Pete Deets photo.

The brake shoe is held in place in the brake head with a key, seen here. Pete Deets photo.

Since these photos were taken the brakes have already been installed onto the 1385’s running gear. SPEC Machine is now turning its attention back to the cab. Upcoming tasks include installing the cab roof’s protective rubber roof installed to keep the weather out and installing the cab electrical system.

On the southern front, progress has continued to at the Continental Fabricators shop in St. Louis, Missouri where the 1385’s new boiler is taking shape. In mid-July 2018, the boiler underwent the first of what will be numerous inspections from the Federal Railroad Administration as the locomotive comes together. In the process of going through its first inspection it earned a boiler number, 9622, for FRA tracking purposes. This means for the first time the new boiler is officially recognized as part of the locomotive. The inspector spent a couple of hours reviewing the parts and pieces and was satisfied with the work to date.

C&NW 1385’s new smokebox on the factory floor in early June 2018. Photo courtesy Continental Fabricators.
C&NW 1385’s 1st, 2nd and 3rd course shell with front flue sheet welded in. Photo taken early June 2018. Photo courtesy Continental Fabricators.

1385’s firebox partially fit to mud ring. Early June 2018. Photo courtesy Continental Fabricators.
A 1385 wrapper side sheet under production. Photo courtesy Continental Fabricators.

C&NW 1385’s new backhead. Photo courtesy Continental Fabricators.
Outer throat sheet. Gary Bensman photo.

Right side wrapper sheet. Gary Bensman photo.
Detail photo of the right front corner of the firebox at the mudring. Gary Bensman photo.

Door hole in door sheet. This is where the fireman will shovel coal into the boiler. Gary Bensman photo.
C&NW 1385’s new backhead. Gary Bensman photo.

The new boiler has been assigned an official boiler number for tracking purposes with the Federal Railroad Administration. Gary Bensman photo.
C&NW 1385’s new wrapper sheet. This will be installed above the firebox. Locations are marked where staybolts will be drilled to secure the wrapper sheet to the firebox. Gary Bensman photo.

New C&NW 1385 boiler next to the new Pennsylvania Railroad T-1 #5550 boiler also under production at Continental Fabricators. Continental quite literally handles projects of all sizes as evidenced by the 12″ gauge live steamer boiler under production in the lower left. Gary Bensman photo.

Front Flue Sheet Installation

Mid-Continent Railway Museum Posted on March 30, 2018 by Jeffrey LentzMarch 30, 2018

New photos are now available from the Continental Fabricators factory floor in St. Louis showing Chicago & North Western 1385’s new boiler under construction. The new images mostly show the installation of the front flue sheet at the front of the boiler.

The front flue sheet (along with the rear flue sheet) support the flues which carry the smoke and hot gasses from the firebox – located at the rear of the locomotive – to the smokebox – located in the front of the locomotive – where they can then escape through the smokestack.

The front flue sheet also has multiple larger diameter holes for supporting the superheater flues. In a superheater-equipped locomotive such as the 1385, the superheater re-heats the steam generated by the boiler, increasing its thermal energy and decreasing the likelihood that it will condense inside the engine. Superheating the steam increases the thermal efficiency of the steam engine.

Lastly, the single largest hole in the front flue sheet supports the dry pipe. The dry pipe carries the saturated steam (i.e. non-superheated steam) from the steam dome to the superheater header before being directed to the superheater flues. Inside the superheater flues the saturated steam becomes superheated and is then directed to the cylinders, which in turn provide power to the driving wheels.

flue sheet before installation

C&NW 1385 new front flue sheet. March 21, 2018. Photo courtesy Gary Bensman.

1385 boiler interior with worker
A Continental Fabricators welder installs C&NW 1385’s front flue sheet. Photo courtesy Gary Bensman.

front flue sheet welding
C&NW 1385’s new front flue sheet is welded in place. Photo courtesy Gary Bensman.

The following two images show 1385’s old boiler to help give perspective of where the front flue sheet resides within the locomotive.  You may notice the pattern of the smaller holes for the tubes is different between the new and old sheets.

One advantage of building a new boiler is that we can correct some compromises made when the Chicago & North Western modified the engine to add the superheaters.  We can also incorporate an updated design for arch tubes in the firebox which will allow us to put tubes back into the area formerly blanked off in the old boiler.  The old boiler has a patch in the belly of the barrel to repair cracking believed to be caused by uneven heating.  Those thermal stresses were thought to be the end result of that bottom area of tubes being removed.  Another advantage of populating that area with flues again is a gain in heating area so the new boiler should steam a slight bit better.

1385 old boiler
This image of 1385’s old boiler shows the location of the front flue sheet at the front end of the boiler where it connects to the smokebox. Note the steam dome visible on top of the boiler toward the rear. MCRM photo.
1385 old boiler
Detail of 1385’s old boiler showing the front flue sheet and smokebox.

The last image from St. Louis shows the hole cut into the top of 1385’s new boiler where the steam dome will be installed.

boiler steam dome hole

The large hole is where the 1385’s steam dome will sit. Photo courtesy Gary Bensman.

Tagged boiler, flue sheet, steam dome, tube sheet

Disassembling 1385’s Pistons

Mid-Continent Railway Museum Posted on March 22, 2018 by Jeffrey LentzMarch 22, 2018

Earlier in the rebuild of C&NW 1385, the cylinders were bored out to make them round once again. [See Nov. 26, 2015 post Driving Wheels and Frame Reunite].  The drawback of that operation is that now the pistons are a bit too small.  Usually the only way around this dilemma was to either build up the edge of the piston with bronze or make a new piston.  Fortunately for us, one of the decisions made over a hundred years ago is of great help to us today.

Location of cylinder/piston.

The C&NW decided to use a multi-part piston rather than a one piece casting in the R-1 class locomotive.  There are two cast steel follower plates that hold what is called a bull ring sandwiched between them and they are bolted together.  Once the bolts are extracted (or broken off) the front plate comes off and the bull ring slides off the rear plate.  The outside diameter of the bull ring determines the size of the piston and the bull ring also has 2 grooves in it to carry the packing rings that actually make the steam-tight seal against the cylinder wall.  A new bull ring for each piston will be machined to the proper size and fitted to the followers.

Both pistons tied down to the workbench for the process. Pete Deets photo.

The face of the piston with 2 of the bolts in place. Pete Deets photo.
The face of the piston with 2 of the bolts in place. Pete Deets photo.

After the front follower has been removed. Pete Deets photo.
Side shot with the bull ring slid part way off. Pete Deets photo.

Rear follower. Pete Deets photo.
Front follower and bull ring. Pete Deets photo.

One bull ring had been built up with bronze brazing rod as shown by the gold color in the below photo. One of the drawbacks in that approach is the heat needed to add the material can distort the shape of the bull ring which it did in this case and it made it difficult to remove from the rear follower.

Bull ring with bronze brazing rod buildup. Pete Deets photo.

An unanticipated find in this process was the bolts holding one piston together were quite badly corroded and several broke in the process of extraction.  As seen in the below photo, two of the bolts that didn’t break are severely necked down.  All new bolts are being produced to ensure the pistons hold together for a good long time.

Worn bolts. Pete Deets photo.

 

Tagged piston

Washout Couplings and Plugs

Mid-Continent Railway Museum Posted on March 8, 2018 by Jeffrey LentzMarch 8, 2018

An important part of caring for a steam locomotive is time-honored boiler wash. Performing boiler washes at regular intervals is mandatory to conform with Federal Railroad Administration regulations and ensures that the locomotive’s boiler is kept free from all corrosion and scaling which would otherwise lead to reduced operating performance and eventually cause damage to the boiler. Boiler washes must be completed after every 31 days the locomotive is in service and is one of the many steps of regular maintenance required to keep a steam locomotive operating. During a wash the boiler is first emptied and then high-volumes of water are flushed through the interior of the boiler and smokebox until no sign of rust, scale or other detritus is detectable in the drainwater.

In order to perform a boiler wash, it is necessary to have numerous access points to the boiler’s interior to direct the water into the boiler as wells as locations for the drainwater to escape. This is achieved through the use of removable plugs of a decent size that can easily be removed and put back in with a steam tight seal.  SPEC Machine is reproducing steam era Huron style [Huron Manufacturing, Inc.] couplings and plugs from certified materials for the task.

washout couplings arrayed on table

New washout couplings for C&NW #1385. Pete Deets photo.

sample washout coupling and plug

New washout couplings with sample plugs from the C&NW #1385’s old boiler. Pete Deets photo.

The couplings will be welded into the boiler shell and the two plugs shown in the above photo (which are actually from the 1385’s old boiler) demonstrate how the plug sits in the coupling and also shows the wide sealing surface that makes the Huron style so easy to use.  With a clean thread and sealing surface a gentle tap or two with the heel of your hand on the end of an 18-inch wrench is all that is needed for a perfectly steam-tight fit.  Much more force than that will only distort the plug and seat and ruin the sealing surface.

bronze rods

SPEC Machine’s Steve Roudebush opens a shipment of new bronze rods which will soon be formed into washout plugs for 1385’s boiler. Pete Deets photo.

Recently the steam bronze arrived for the new plugs and was photographed being unboxed by SPEC Machine’s Steve Roudebush.  Those two sticks total over 300 lbs. of material.  The next step is to whittle away anything that doesn’t look like a Huron plug.

Engineering calculations show the threads should be able to withstand pressure up to 13 times greater than the boiler’s design pressure but calculations alone aren’t good enough. One extra coupling was made to serve a dual purpose.  First, it will be welded into a piece of test material so we can gauge how badly the heat of the welding process will distort the coupling.  The test material will also have a fitting applied to allow the 1385 team to hook it up to the hydrostatic pressure test pump.  Once a plug is made, it will be screwed into the coupling and can be pressure tested as a system to further prove the safety of the design before it gets installed on the actual boiler.

Meanwhile in St. Louis, Missouri, Continental Fabricators has continued production work on the new boiler. This photo recently shared by Continental Fabricators’ staff shows the front courses welded together.

three boiler courses welded together

Welded front courses of Chicago & North Western #1385’s new boiler. March 5, 2018. Photo courtesy Continental Fabricators.

Tagged boiler, boiler wash, washout plugs

Lots and Lots of Staybolts

Mid-Continent Railway Museum Posted on February 2, 2018 by Jeffrey LentzFebruary 2, 2018

A brief update to yesterday’s discussion on staybolts:

SPEC has received the stock to be used for C&NW No. 1385’s rigid staybolts and is cutting it to the length, engraving the heat number and drilling the tell-tale holes per Continental Fabricator’s specifications. There will be over 1000 new rigid staybolts created in all, cut to five different lengths as required by 1385’s boiler.

stack of bolts
Stock is being cut to the proper length for producing 1385’s rigid staybolts. Ed Ripp photo.
staybolt stock on floor
SPEC Machine employees work on cutting the stock to length as the first step of producing over 1000 rigid staybolts for C&NW 1385. Ed Ripp photo.

Tagged staybolts

Post navigation

← Older posts
Newer posts →
QUICK LINKS
PLAN YOUR VISIT
BUY TICKETS
GIFT SHOP
DONATE
JOIN OUR EMAIL LIST
VIEW WEBCAMS
Live view of North Freedom depot

Contact Us

Mid-Continent Railway Museum
P.O. Box 358
E8948 Museum Road
North Freedom, WI 53951
Office phone: 608-522-4261
or 800-930-1385
E-mail: inquiries@midcontinent.org

Recent News

  • Montana Western #31 – Winton Engine Restoration Has Been Successfully Completed
  • “Last Spike” Ceremony
  • Engine House Track #2 Update
  • 1385 Steam and Air Line Installation/Donation Update
  • #1385 Cab, Smoke Stack, and Hand Rail Installation/Donation Update
©2025 - Mid-Continent Railway Museum - Weaver Xtreme Theme Privacy Policy
↑