↓
 

Mid-Continent Railway Museum

North Freedom, Wis.

Text: Mid-Continent Railway Museum. A historical and educational experience. Images of railway cars, people, and Mid-Continent logo.
  • Home
    • Home Page
    • News
    • Join Our Email List
    • Media
  • Plan Your Visit
    • Buy Tickets
    • Train Ride/Museum Info
    • Special Events
      • Autumn Color™ Weekend
      • Pizza Limited
      • Harvest Flyer
      • Pumpkin Special™
      • Root Beer Float Flyer
      • Santa Express™/Holiday Flyer
      • Stars and Stripes Special
      • Vintage Rail Car Tours
    • Cancellation Policy
  • Gift Shop
  • Restorations
    • Major Projects
    • Steam Status
      • Overview
      • C&NW #1385 Status Updates
      • Western Coal & Coke #1 Status Updates
      • Dardanelle & Russellville #9 Status Updates
    • Car Shop
      • General Updates
      • DSS&A Sleeper DULUTH
      • EJ&S #2
      • Badger #2
      • Copper Range #25
      • MLS&W #63
      • Copper Range #60
  • Equipment Roster
    • Equipment Roster Home
    • Steam Locomotives
    • Diesel/Other Locomotives
    • Wooden Passenger Cars
    • Steel Passenger Cars
    • Wooden Freight Cars
    • Steel Freight Cars
    • Cabooses
    • Service Equipment
    • Former Collection Items
  • Resources
    • Online Archives Home
    • Wooden Car Builders
    • MCRM Newsletters
    • Gazette Archive
    • Audio Archive
    • Video Archive
    • Wallpaper
    • Kids Page
      • Kids Page
      • What Makes A Diesel Locomotive Work?
      • What Makes A Steam Locomotive Work?
  • About Us
    • Contact Us
    • About Mid-Continent
    • Board of Directors
    • Department Leaders
    • Our Staff
    • Become a Member
    • Volunteer
    • Employment
    • Tour of Grounds
    • Local History
    • Mid-Continent Timeline
    • Privacy Policy
  • Donate

Post navigation

← Older posts
Newer posts →

Coronavirus Update: MCRM to Close Starting March 24, 2020

Mid-Continent Railway Museum Posted on March 23, 2020 by Jeffrey LentzMay 4, 2021

Effective March 24, 2020, in compliance with orders from Governor Tony Evers, Mid-Continent Railway Museum will be closed until further notice to help reduce the spread of the Coronavirus. The order applies to all non-essential businesses in Wisconsin.

What this Means

  • Although Mid-Continent was already closed to the public for the winter season, the property is now fully closed to all volunteers and members, including owners of private railcars kept on the property.
  • No volunteer work sessions will be held.
  • The MCRM administrative office will be closed.
  • The April 4th Mid-Continent member meeting and banquet has been canceled. The guest speaker has been rescheduled for our Fall 2020 banquet. If you already sent a check in the mail for the banquet meal, the check will be returned to you.

If You Need to Contact Mid-Continent Staff

  • Museum email addresses will continue to be monitored and responded to, including the museum’s general email address: inquiries@midcontinent.org. This is the best method of communication during this time.
  • The phones will no longer be staffed during business hours, but voicemail messages will be checked regularly and responded to within 2 business days. To leave a message for staff, call 608-522-4261.
  • U.S. Postal Service mail sent to Mid-Continent will continue to be checked.

Impact on 2020 Train Ride Schedule

Our operating season is scheduled to begin on May 9th. Due to the rapidly evolving situation, it is unknown at this time if Mid-Continent will be able to begin normal operations as scheduled. At this time, no new reservations are being accepted for any trains through May 31st. Further announcements will be made in the coming weeks.

Thank you for your understanding and stay healthy.

Sincerely,

The Mid-Continent Railway Historical Society President & Office Staff

DULUTH Sleeping Car “Buy a Berth” Fund Drive Reaches Goal

Mid-Continent Railway Museum Posted on January 29, 2020 by Jeffrey LentzJanuary 29, 2020

Mid-Continent’s efforts to fully restore one of the nation’s oldest and most intact railroad sleeping cars just got one step closer to reality. In late January 2020, Mid-Continent Railway Museum achieved the goal set forth four months earlier when the “Buy a Berth” fund drive was announced. The goal was to raise $32,000 to cover the cost of replicating the car’s berths as part of the car’s restoration back to its original appearance and making it mechanically operational. Mid-Continent is extremely pleased and thankful for the generous support that donors have provided for this fund drive.

When the sleeping car, named DULUTH, is complete it will be a rare time capsule demonstrating what long-distance overnight rail travel was like over a century ago. The car is what is known as a 10-section sleeper. In addition to a private stateroom, a smoking room, and washrooms, the car’s main feature was a central room with 10 compartments. The compartments contained seats by day and were converted to beds at night. Each compartment had an upper and lower berth where passengers would sleep as their train traveled the Duluth, South Shore & Atlantic Railway between Duluth, Minnesota, through northern Wisconsin and the Upper Peninsula to Sault Ste. Marie, Michigan. Two sets of the original berths survived, but the eight other sets of berths were removed over 80 years ago when the car was retired from railroad service and moved to the shores of Lake Superior where it was used as a family’s summer cottage.

people listening to tour guide

A tour group views the DULUTH in Sept. 2019. New berth partitions between sleeping compartment sections were fitted in 2019 in preparation for the reproduction of the car’s missing berths. MCRM photo.

In 2015 the car was donated by its owners and moved to North Freedom, Wisconsin. The small town of just 701 people is home to Mid-Continent Railway Museum which boasts a nationally-renowned wooden railcar collection and restoration program. Railroads used railcars primarily built out of wood until the early 1900s when manufacturers transitioned to primarily steel construction. Mid-Continent is home to one of the largest collection of wooden railroad passenger cars in the country.

The original berths featured expertly crafted woodwork including curved shapes and marquetry patterns set within the mahogany veneer. To replace the intricate woodwork and patterns, Mid-Continent Railway Museum turned to help from a master woodworker and a marquetry expert. The craftsmen began working on the project soon after donations from the fund drive began coming in. As the fund drive wraps up, work on the berths is already well underway. The upper berths are completed but awaiting finishing (stain and varnish). The lower seat ends are still in the process of being fabricated. The following photos by William Buhrmaster taken on January 28, 2020, illustrate the current status of the berths and lower berth seat ends.

man next to patterned berth

Bob Berghorst shows the fine marquetry on one of the completed upper berths for the DULUTH during a visit to his shop on January 28, 2020.

new upper berths for sleeping car
Six new upper berths for the DULUTH. All woodwork is completed. The next steps will be staining and varnishing
stack of wood components
These are the four curved portions of the replicated lower berth seat ends. Next steps are to cut to shape and apply the mahogany veneer

original berths from a railroad sleeping car
Original berths and lower seat end from the DULUTH sleeper that are awaiting to be stripped. The original and reproduction berths will be finished at the same time so all of them will match.
Duluth seat end
This is one of the original lower seat ends stripped of the padding and upholstery. This was done so the wood components can be accurately reproduced.

Thank you to everyone who bought a berth!

The DULUTH has already seen a great deal of progress since it arrived at Mid-Continent Railway Museum. The wheels and trucks – the assembly that holds the wheels – were removed from the car along with the berths when it became a cottage. Replacements wheels and trucks from a similar car were procured and installed upon the DULUTH’s arrival at the museum. Similarly, replacement draft gear – the parts that allow connecting railcars together – and the air brake equipment have also been salvaged from other cars and installed on the DULUTH.

Many hours of work still lay ahead for the Mid-Continent volunteers leading the restoration effort. The men’s washroom and smoking room were removed to make way for a kitchen when the car was used as a cottage and still requires restoration, along with things like light fixtures, upholstery, flooring, and many other details.

Mid-Continent Railway Museum is seeking donations to help with the restoration of these other areas of the DULUTH. To make a donation or see the current overall DULUTH fundraising status, check out our earlier post titled DULUTH Fundraising Status.

Members of the Soo Line Historical & Technical Society tour through the Mid-Continent Car Shop, including through the DSS&A DULUTH sleeping car (at left) on Sept. 13, 2019. MCRM photo.

 

 

Posted in DSS&A Sleeper DULUTH, News | Tagged DSS&A DULUTH

More on the 1385 Boiler Delivery and Subsequent Progress

Mid-Continent Railway Museum Posted on January 14, 2020 by Jeffrey LentzJanuary 14, 2020

It has been some time since our last C&NW 1385 status update. Upon delivery of the boiler, a few photos were posted with the promise of more to come, but as Mid-Continent entered our busy special event season the sharing of additional photos and videos got put off by more pressing projects. However, that doesn’t mean work halted on the 1385. Now that the busy 2019 season is behind us, we’ve had a chance to put together this mega-update for you.

Boiler Delivery

C&NW 1385’s boiler has represented the single most challenging part of the locomotives rebuild. Planning of the boiler was started early in the rebuild process and in-depth engineering work started in 2015. The construction contract was signed with Continental Fabricators in late 2016. Many design iterations went back and forth as the project volunteers, boiler engineer, and manufacturer exchanged ideas and tweaked components. Finally, by late September 2019 the boiler was ready to ship, arriving on September 26, 2019. The following photos explain the activities.

In addition to still photos, a series of GoPro cameras mounted on the locomotive, a tripod camera, and a drone were all on hand leaving no angle uncovered. The following photos and video are courtesy Jeffrey Lentz and Randy Long. Update text by Peet Deets and Jeffrey Lentz.


After departing the previous day from St. Louis and arriving at SPEC Machine in the middle of the night, 1385’s boiler is prepped for unloading. Although paling in size to some locomotives, the 1385 is hardly small – seen here dwarfing SPEC Machine’s forklift being used to unload spare boiler tubes from the trailer. As hinted at by the photo backgrounds, SPEC Machine is not normally a locomotive heavy repair shop and is actually located on a working farm.

1385’s running gear was pre-positioned outside on temporary track in order to receive the boiler.


LEFT: SPEC Machine owner, Steve R., talks unloading strategy with 1385 Task Force volunteer Pete D. (in hard hat). CENTER: Mid-Continent volunteer Ed R. gets ready to attach the crane’s lifting straps to the 1385 boiler. RIGHT: Brett M., the engineer of the new boiler, is on hand to help with the boiler lift and make sure everything goes smoothly.

The new boiler is gently lifted off the trailer as SPEC Machine’s Steve R. looks on.

In short order, the boiler has been positioned over the locomotive’s running gear and has started being lowered.

SPEC Machine’s Tyler R. keeps hold of a tether attached to the boiler. Wind speeds picked up as the lift was underway, causing the boiler to want to sway and swivel. The tether straps permit control over the lift without risk of getting fingers or hands pinched by the 41,000 lb boiler.

Despite the large size of the equipment involved, it is a game of fractions of an inch when it comes to placing all the pieces together. Here 1385 Task Force member Mike W. is seen taking a tape measure reading as they battle a bit of a breeze while trying to set the boiler on the exact spot needed.


LEFT: Some components couldn’t be fabricated until after the boiler was fitted and tolerances defined. In the meantime, timbers are used to support the boiler on the firebox end. CENTER: Ed R. verifies boiler placement against blueprints from the Chicago & North Western railroad. RIGHT: The increasing wind level made positioning the boiler on the exact centerline of the frame increasingly difficult. A speed square is pulled out to verify the accuracy of the last attempt.


1385’s boiler is Inside SPEC Machine’s shop, waiting on other parts of the locomotive to catch up before the cab can be installed. Since previous updates, the roof has been covered and rain gutters installed. Inside the cab the wiring for various electrical systems have been installed.

Boiler placement continues to be adjusted as friends and family members look on from inside the shop.

One of the boiler supports was discovered to be positioned slightly too high causing the boiler to sit unevenly. Adjustments are quickly made by Mike W. and Steve R.

With the ash pan and grates not yet installed, this view looking up into the firebox was possible, showing the arch tubes which help circulate water around the firebox walls.

After a bit of struggle fighting the wind, the crew was finally able to get the boiler placement just right and the crane was able to set it down.


Key members of the 1385 crew gather for a group photo to celebrate the completion of a major step in the 1385’s journey toward operation. From left to right, Tyler R., Pete D., Steve R., Mike W. Tim K., and Ed R.


After the boiler was placed and a lunch break enjoyed, a tractor was used to tow 1385 inside the shop bay where work will continue.

Progress Since the Boiler Delivery

In the time since the boiler was delivered work has continued on the hundreds of to-do list items that need to be checked off before the locomotive assembly can be completed. These tasks are less attention-getting than a new boiler, but no less important to the locomotive’s rebuild.

In November 2019, a MCRM members work session was held to help organize the thousands of parts and pieces associated with the locomotive. The palette racking set up during the Member’s work session is being put to good use. As seen here, the racking has tripled the amount of usable space for storage in that spot.

Progress has been made on items that will go both inside and outside the new boiler. Here is the air-operated firedoor that is the target of every fireman. The 1385 is a hand-fired coal-burning locomotive so every shovel full of coal passes through this door. The control valve, cylinder and piston have been rebuilt so the door was able to open itself for the first time in over 20 years.

SPEC Machine’s Steve R. is explaining the disassembly of one of the two steam-driven air compressors that supply air for the braking system and other appliances of the 1385.  Both compressors will be torn down for inspection and necessary repair.  After rebuilding they must be tested to Federal Railroad Administration specification in order to prove they can deliver enough compressed air for safe train operation.


Here is a shot of what is actually the bottom of the superheater header.  As you can see the years have not been kind to the header and some pieces have been broken out.  It was found that the header was weldable so the small blocks shown were welded in to replace that material that had been chipped out.  The area to be repaired must be pre-heated to several hundred degrees Fahrenheit and will be covered with insulation afterward so it will cool very slowly to prevent cracking. The second photo shows the bottom of the superheater header after the welded repair.  After a bit more cleanup the sockets seen in the surface will be cleaned up by machining so they will be ready to accept the superheater units and be clamped to a steam tight joint.

IMAGE 2: The throttle has its bottom sealing surface machined. The throttle is positioned upside-down in this image.
IMAGE 2: 1385’s throttle (top view).

This is the throttle body that normally resides inside the steam dome and is used to control the amount of steam getting to the cylinders.  In the first photo it is upside down in the large milling machine so one of the surfaces that connects to the dry pipe can be cleaned up and made steam tight.  A leak at that end of the throttle body would allow a constant flow of steam into the cylinders that could not be controlled.

The second photo shows the throttle body as it will sit in the steam dome.  The throttle spool will fit down into the large opening and when the throttle is shut the top of the spool will rest on the upper edge of the opening where you can see the small beveled edge.  The bottom side of the spool will rest against a similar sealing edge inside the body to create the steam tight seal of a closed throttle.

IMAGE 3: Detail view of the bottom of the throttle. This is the end that will connect to the dry pipe.

The first photo above is of the throttle spool sitting upside down on the bench.  The shiny edge just inside the ring of the spool closest to the camera will contact the sealing surface inside the throttle body.  The shiny edge at the table will contact the surface at the top of the throttle body.

The second photo shows the sealing surface at the bottom-most end of the throttle body where the body will connect to the dry pipe.  This is the surface that was getting machined in the picture of the body in the milling machine.

This is the superheater header wrapped in insulation to allow it to slowly cool after the repair welding.  The superheater eventually will be installed inside the smokebox at the front of the boiler. The two large flanges seen in the photo connect to the branch pipes that carry the superheated steam down to the valves and cylinders which then turn the driving wheels.

This is the bracket mounted inside the steam dome at the top of the boiler that will hold the throttle body. The fire tubes and a couple of superheater flues are visible inside the boiler.

This is the throttle body (now attached to the bracket from the previous photo) and looking at the sealing surfaces for the spool.  The shaft of the throttle spool will drop down through the hole in the center of the body.

A different view of the throttle body mounted to the bracket and edge of the steam dome.  The front of the locomotive is to the right and the backhead, cab and crew would be to the left.  Differing from the old boiler, the new boiler has a removable steam dome and the dome ring has been pulled off to accommodate this fitting work.  When re-installed, the ring will extend well above the throttle so the dome lid can be properly installed.


Lastly, we have a before and after picture of the ball ends of the superheater units.  Before cleanup you can see how rough they became through use and storage.  The ends now have a freshly polished sealing surface.ange.

Thank you for your patience with our delays getting this update created. We’re looking forward to a productive 2020!

Please remember that while we appreciate the public’s enthusiasm to see 1385’s progress, the contractor shop where the 1385 work is taking place is a private business, not a museum. They are not open for public tours. Any persons without prior authorization showing up at their shop hoping to see the 1385 will be turned away. If you wish to partake in future 1385 volunteer work sessions, consider joining Mid-Continent as a member.

Tagged boiler, cab, superheater

2020 Calendars Now Available

Mid-Continent Railway Museum Posted on November 30, 2019 by Jeffrey LentzDecember 12, 2019

Mid‑Continent Railway Museum’s “Whistle on the Wind” 2020 wall calendars are now available. The calendar features six color and seven black & white images. Images are a mix of historical railroad imagery as well as more contemporary scenes from Mid‑Continent Railway Museum. Many dates feature “this day in history” factoids about railroads of the Upper Midwest and Mid‑Continent’s own history. Quality metal binding keeps the calendar flat against the wall.

2020 calendar image previews

Calendar Format Preview

To arrive before December 25th, orders must be placed by December 19th. All orders are shipped via U.S. First Class mail.

Mid-Continent Railway Historical Society members receive one copy free automatically as part of their membership benefits. Members also receive discounted pricing when ordering additional calendars.

Quantity Public Price Member Price Shipping*
1 $9.50 $7.00 $3.00
2 $19.00 $14.00 $6.65
3 $28.50 $21.00 $6.65

*Price shown is for shipping calendars to a single US address.

Order Your Calendar

To order your calendar, call the Mid-Continent office Monday-Friday 9 AM to 4 PM at (608) 522-4261 or toll-free (800) 930-1385.

You can also order online using any major credit/debit card. Shop with confidence using the secure PayPal online order form (PayPal account not required). Select the appropriate button below to begin your order.

Public Price Member Price






Tagged calendar

DULUTH Sleeping Car Update and “BUY A BERTH” Fund Drive

Mid-Continent Railway Museum Posted on November 1, 2019 by Jeffrey LentzJune 3, 2021

DULUTH Restoration – November 2019 Update

Mid-Continent Railway Museum has been working on restoring the oldest and most complete wooden sleeping car in the country to its original beauty and operating condition. Thanks to many supporters and generous donations the car was acquired and moved to the Mid-Continent Railway Museum in September 2016.  Upon arrival, the car was placed on a pair of 6-wheel trucks and within 12 months Mid-Continent volunteers had installed couplers and draft gear. This summer the air brake system including the air brake cylinder, reservoir and all of the air piping was completed. Inside the car, the missing berth partitions and lower berth seatbacks have been replicated and installed.

The next step in the program is to replicate the missing upper and lower berths that will be installed between each of the berth partitions. New berths are required as the past owners removed 8 of the 10 berths from the car over 80 years ago. The upper berths are challenging to reproduce due to their curved shape and the fine marquetry patterns set into mahogany veneer. Fortunately, we have located a master woodworker and marquetry expert in Michigan that have the needed skills and abilities to accurately reproduce the missing berths from the DULUTH.  In order to replicate the missing berths, we must raise $32,000 to get the DULUTH one step closer to being a restored masterpiece.

Introducing the “BUY A BERTH” Fund Drive [FUND DRIVE COMPLETED AS OF JAN. 29, 2020]

To fully restore the sleeping section of the DULUTH, your help is needed to raise $32,000 for replicating the upper and lower berth seat ends. With the “BUY A BERTH” Fund Drive donors can donate towards replicating the eight missing upper or lower berths. With a $1,500 donation (for a lower berth) or a $2,500 donation (for an upper berth) we will be able to get a berth replicated and you’ll have your name associated with one of the berths in the car. Donors that make a donation to the “BUY A BERTH” Fund Drive in the full amount of a berth ($1,500 or $2,500) will have their name placed on a plaque mounted inside the car. All donations less than $1,500 will be pooled together to go towards the cost of replicating a berth.

How You Can Help

UPDATE: The “Buy a Berth” Fund Drive was completed on Jan. 29, 2020. Donations are still needed for other areas of the DULUTH’s restoration. 

 

You can donate by mail by sending a check to:

Mid-Continent Railway Historical Society
PO Box 358
North Freedom, WI 53951

Please be sure to write “DULUTH Sleeper” in your check memo line, in the online donation form, or in the special projects box of our printable donation form.

All donations are tax-deductible. Any donations received in excess of the Buy A Berth Fund Drive goal amount will be used to assist with other areas of the DULUTH’s restoration.

Posted in DSS&A Sleeper DULUTH, News | Tagged DSS&A DULUTH, DULUTH

Post navigation

← Older posts
Newer posts →
QUICK LINKS
PLAN YOUR VISIT
BUY TICKETS
GIFT SHOP
DONATE
JOIN OUR EMAIL LIST
VIEW WEBCAMS
Live view of North Freedom depot

Contact Us

Mid-Continent Railway Museum
P.O. Box 358
E8948 Museum Road
North Freedom, WI 53951
Office phone: 608-522-4261
or 800-930-1385
E-mail: inquiries@midcontinent.org

Recent News

  • Montana Western #31 – Winton Engine Restoration Has Been Successfully Completed
  • “Last Spike” Ceremony
  • Engine House Track #2 Update
  • 1385 Steam and Air Line Installation/Donation Update
  • #1385 Cab, Smoke Stack, and Hand Rail Installation/Donation Update
©2025 - Mid-Continent Railway Museum - Weaver Xtreme Theme Privacy Policy
↑