Crane Built to Assist with Restoration

Bob and Dave have built a crane to lift and position the front tube sheet for the WC&C #1. We test drove the crane last week.

Welding on the rear sheet continues as well as work on the frame and running gear. During Snow Train™ weekend, riveting the mud ring was started.

Comments are closed.