↓
 

Mid-Continent Railway Museum

North Freedom, Wis.

Text: Mid-Continent Railway Museum. A historical and educational experience. Images of railway cars, people, and Mid-Continent logo.
  • Home
    • Home Page
    • News
    • Join Our Email List
    • Media
  • Plan Your Visit
    • Buy Tickets
    • Train Ride/Museum Info
    • Special Events
      • Autumn Color™ Weekend
      • Pizza Limited
      • Harvest Flyer
      • Pumpkin Special™
      • Root Beer Float Flyer
      • Santa Express™/Holiday Flyer
      • Stars and Stripes Special
      • Vintage Rail Car Tours
    • Cancellation Policy
  • Gift Shop
  • Restorations
    • Major Projects
    • Steam Status
      • Overview
      • C&NW #1385 Status Updates
      • Western Coal & Coke #1 Status Updates
      • Dardanelle & Russellville #9 Status Updates
    • Car Shop
      • General Updates
      • DSS&A Sleeper DULUTH
      • EJ&S #2
      • Badger #2
      • Copper Range #25
      • MLS&W #63
      • Copper Range #60
  • Equipment Roster
    • Equipment Roster Home
    • Steam Locomotives
    • Diesel/Other Locomotives
    • Wooden Passenger Cars
    • Steel Passenger Cars
    • Wooden Freight Cars
    • Steel Freight Cars
    • Cabooses
    • Service Equipment
    • Former Collection Items
  • Resources
    • Online Archives Home
    • Wooden Car Builders
    • MCRM Newsletters
    • Gazette Archive
    • Audio Archive
    • Video Archive
    • Wallpaper
    • Kids Page
      • Kids Page
      • What Makes A Diesel Locomotive Work?
      • What Makes A Steam Locomotive Work?
  • About Us
    • Contact Us
    • About Mid-Continent
    • Board of Directors
    • Department Leaders
    • Our Staff
    • Become a Member
    • Volunteer
    • Employment
    • Tour of Grounds
    • Local History
    • Mid-Continent Timeline
    • Privacy Policy
  • Donate

Category Archives: Car Shop

Follow the restorations in Mid-Continent’s award-winning Car Shop.

Post navigation

← Older posts
Newer posts →

2021 Restoration Work Session Schedule Announced

Mid-Continent Railway Museum Posted on March 8, 2021 by Jeffrey LentzOctober 20, 2021

In preparation for resuming volunteer work at Mid-Continent, I’m pleased to rollout the 2021 Restoration Department Volunteer Work Session Schedule. The volunteer work sessions kick off with the first session on April 5th – 7th and runs through December with one or more session each month. In addition, based on the availability of volunteers, we will add a number of non-scheduled sessions during the season so be sure to be on the outlook for these notices.

About a week prior to each session a reminder and call for help will be posted to the Member’s Discussion Board [Mid-Continent membership required to access] and a notice will be sent out via email to the volunteers on the Restoration Department’s email distribution list. To help with the work session planning we’re asking all volunteers interested in joining a work session to contact Bill Buhrmaster in advance of the work session. This helps make sure that we make the best use of our volunteers and we can have productive sessions. [If you don’t already have Bill’s contact info, reach out to the MCRM office at inquiries@midcontinent.org].

We have a solid core of volunteers that help with the restoration work and we’re very interested in expanding the group that actively participates in the Car Shop. Our doors are open to anyone willing to give us a hand and help us with the restoration work. Give us a hand for a day or several days throughout the summer. Every bit of help make a difference and is appreciated. We have a wide range of needs (i.e. painting, cleaning, stripping, wood work, roofing, refinishing, upholstery, metal work and more) and everyone can be a help. If you’re interested in volunteering or would like more information, please feel free to drop into the Car Shop during a work session or contact me.

For everyone’s safety and health we will be following the Covid regulations including those for social distancing and for wearing masks. We will have and maintain the appropriate cleaning supplies and hand sanitizer on hand in the Car Shop. The regulations and requirements may change over time but we want to do our part to make sure everyone returns home healthy.

In the event that you’re not comfortable working at the museum during the pandemic or you’d like to like to do some volunteering from home we can use your help with our “at home” projects. We maintain a good size list of “at home” projects that may be of interest. This is work that can be picked up at the museum, worked on at home and returned to the museum at a later date. The “at home” projects are typically parts and pieces that need to be cleaned up and repainted or new parts that require painting and varnishing. Please contact me if you’re interested in assisting with any of the “at-home” projects.

Despite the pandemic we managed to have a productive 2020 thanks to outstanding support from the volunteers that participated in the work sessions and helped us out from their homes. We’re hoping to do even better this year as we have a good project list and plenty of opportunities for volunteers to participate in a wide variety of projects. Please join us as we welcome everyone willing to help us preserve and restore Mid-Continent’s Collection pieces.

I’m looking forward to seeing you in the Car Shop! 

Bill Buhrmaster
MCRM Restoration Manager

Date(s)Session Type
April 5-6-7Restoration Dept. Work Session
April 9-10-11Restoration Dept. Work Session
April 16-17-18CANCELED: Restoration Dept. Work Session
April 23-24-25ADDED: Restoration Dept. Work Session
April 30 – May 2Restoration Dept. Work Session
May 14-15-16Restoration Dept. Work Session
June 4-5-6Restoration Dept. Work Session
June 25-26-27Restoration Dept. Work Session
July 9-10-11Restoration Dept. Work Session
July 23-24-25Restoration Dept. Work Session
August 6-7-8Restoration Dept. Work Session
August 20-21-22Restoration Dept. Work Session
August 28-29 ADDED: Restoration Dept. Work Session
September 10-11-12Restoration Dept. Work Session
September 17-18-19Restoration Dept. Work Session
October 1-2-3Restoration Dept. Work Session
October 2-3Vintage Rail Car Tours Event
October 15-16-17Restoration Dept. Work Session
October 22-23-24-25ADDED: Restoration Dept. Work Session
October 28-29-30-31MORE DAYS ADDED: Restoration Dept. Work Session
November 13-14Restoration Dept. Work Session
December 4-5Restoration Dept. Work Session

Restoration Department 2020 Progress Report

Mid-Continent Railway Museum Posted on December 18, 2020 by Jeffrey LentzDecember 18, 2020

Volunteers in car shop

As 2020 draws to a close, the Mid-Continent Railway Museum Restoration Department is pleased to look back at this challenging year with a sense of teamwork and accomplishment. All things considered, we had a good year but volunteer work at the museum was shut down from mid-March through early June, reducing our annual planned work sessions by 25%. On June 6th volunteer activity resumed at the museum, and thanks to savings funds and the generosity of donors we were still able to make headway on projects without using any of the museum’s operating funds.

To help navigate the pandemic more frequent work sessions were held to spread out the work and the volunteers. The level of dedication was impressive as volunteers were working in the Car Shop with great regularity up to the end of October. Even with the museum closed to the public and pandemic occurring a total of (28) different volunteers took part in the work sessions and collectively put in over (265) man-days of work at the museum throughout the year. An equal amount of time was put in by volunteers working on projects at home throughout the year.

Thank you to everyone that helped us by volunteering and/or by donating to preserve and restore the historic railroad equipment at Mid-Continent. The accomplishments listed in this report could not be possible without the dedicated group of volunteers. Summarized below is a list of the progress and accomplishments for the Restoration Department in 2020.


East Jordan & Southern combine #2

The west side letter board was completed with the filling of screw and nail holes, sanding and priming. The east side letter board required patching, installation and fabrication of the north end extension which was missing. That was followed by filling, sanding and more priming to complete the letter board. The north end drip boards were also installed. Three of the four platform steps have been taken apart and are in the process of being rebuilt. Work was also started on cleaning up the trucks. Remnants of pinning striping were uncovered, likely dating back to the 1902 refurbishment by Hicks Locomotive & Car Works.

In the second half of the summer work moved to the interior of the car. The east side wall boards had previously been removed from the car. The paint was stripped from these boards and the wall is in the process of being rebuilt. Much of the paint on the west side wall has also been removed although the wood needs to be cleaned up with chemical stripper. Also work was done on the floor to replace some bad wood and missing boards. Finally, all the clerestory windows were removed. The stained glass will be remounted in new frames during the winter months.

The east side of the EJ&S #2 with the letter board completed.
Interior paint stripping in progress in the passenger section.

Related Links:
EJ&S # 2 Restoration Updates
EJ&S #2 Roster Page


Duluth South Shore & Atlantic DULUTH Sleeper

The year kicked-off by successfully meeting the fundraising goal for the “Buy A Berth” fund drive. These funds enabled the contractor to replicate the missing berths for the car. By late summer the new upper berths and lower berth seat ends were all constructed. In addition replacement cast brass claw feet were made and polished for the new seat end. With the new berths completed efforts turned to stripping the old finish (shellac) off

of the original upper berths and seat ends. Presently all of the berths and seat ends are awaiting the application of the stain and varnish.

One of four existing berths stripped in prepraration of being stained and varnished.
Two of the existing lower berth seat ends stripped in preparation of being refinished.

Inside the car volunteers focused on working in the sleeping compartment by removing 9 of the 10 veneer headlining ceiling panels that were water damaged and couldn’t be salvaged. In addition all interior hardware (i.e. berth pulleys, latches, roller shades) was removed so the parts can be cleaned and restored. A prototype of the mahogany berth partition trim piece (an overlay) was developed and test fit in the car. Also all of the existing seat cushions (backs, bottoms and head rests) from the sleeping compartment of the car were removed. In early fall samples of missing woodwork in the sleeping compartment were removed from the car so the parts can be replicated as part of the 2021 work.

Duluth lower interior roof after the headlining panel was removed.
Fred B. test fits the berth partition overlay.

On the exterior of the car the window sills on both sides of the car were removed as all of it was rotten and couldn’t be salvaged. In addition, volunteers started to remove the existing rolled roofing material off of the roof. Plans call for removing the balance of the rolled roofing in 2021.

A portion of the roofing removed off of the DULUTH
Window sills removed from the DULUTH’s west side.

Under the car significant progress was made on the air brake system as the brake foundation plan was finalized. With the design set volunteers proceeded to reposition the air cylinder and complete all of the air piping under the car. The next steps will be to fabricate and install the brake levers and rods to the trucks.

Mike M. moves the DULUTH’s air brake cylinder.
The air cylinder and piping work completed under the DULUTH.

Volunteers working at home made significant progress of restoring hardware for the car. Work completed ranged from restoring oil lamp roof vents to over 300 pieces of berth and sleeping compartment hardware.

Restored berth pulley
Restored and polished window lifts

Related Links:
DSS&A DULUTH Restoration Updates
DSS&A DULUTH Roster Page


Goodman Lumber Co. Shay #9

The water tank was bolted to the frame and the tank was re- lettered. The rear sand tanks were restored and re-installed as were the rear steps. The whistle was removed and a new lever (previously missing) was replicated. The wood tool box that was mounted on the rear of the Shay was constructed (to be installed in 2021). Main air reservoir and the front head light removed for restoration and re-painting. Lastly, a pair of Lima gauge lamps (for the steam gauge and water glass) were acquired and restored.

Chris adds lettering to the Goodman Shay tank.
Freshly painted tank of the Goodman Shay .

Related Links:
Goodman Lumber Co. #9 Roster Page


Lake Superior & Ishpeming coach #64

All of the seat castings and cast heat guards were de-burred and painted. All of the upper and lower sash (inner) windows were stained, varnished and glazed. The lower roof repairs were completed on the NE corner of the car and the lower roof repairs in the NW corner of the car are in process.

Tom sanding one of 70 window frames completed this year for the LS&I #64.
A sample of the completed and painted seat castings for the LS&I #64.

Roof repairs to LS&I #64 in progress with Jerry and Jack.
David works on roof repairs to LS&I #64.

The team of Jeff H. and Owen glazing LS&I #64 windows.

Related Links:
LS&I #64 Roster Page


Soo Line stock car #29667

Installed a new steel roof on the Soo Line stock car.

The completed roof project on Soo Line #29667.
Richard (L) and Patrick (R) working on installing the steel roof panels on the Soo Line stock car.

Related Links:
Soo Line #29667 Roster Page


Soo Line caboose #203

The old rolled roofing material was removed off of the entire roof. More siding repairs and replacement were made and the side windows were removed (for restoration). A replacement oak end beam (for the north end) was purchased and is in the process of drying out so it can be cut and installed in 2021.

Current state of the work in process on the Soo Line #203.

Related Links:
Soo Line #203 Roster Page


Milwaukee Lake Shore & Western coach #63

An original Dayton Mfg. Company side lamp was restored and installed in the MLS&W #63 coach. This is the first of eight side lamps needed for the car.

Dayton Mfg. Company side lamp inside MLS&W #63.

Related Links:
MLS&W #63 Restoration Updates
MLS&W #63 Roster Page


Duluth South Shore & Atlantic coach #701

Portions of the east side of the DSS&A #701 coach were restored and repainted so the original style numbers could be painted onto the car.

Portions of the east side of DSS&A #701 painted and lettered to match historic photos.

Related Links:
DSS&A #701 Roster Page


Badger Fish Car #2

Restored and installed (8) window guards in the car. Installed the missing step trap latch and in the process of installing the blind hardware (lifts and springs) on the wood blinds (8 of 21 completed).

Two of the window guards installed on the Badger #2.
The Badger #2 window blinds with the hardware installed.

Related Links:
Badger #2 Roster Page


Car Shop/Miscellaneous

  • Scaffold Upgrades made and the elevated work area was
  • Electrical service provided to the large ventilation fan (south end)
  • Electrical service provided to the south end work deck area
  • Restored and repainted the two vestibule doors for the Soo Line #2017
  • Installed tarps on the CB&Q #1490 and the KGB&W #76 baggage cars
  • Applied clear coating to the: DSS&A #18052 (box car), DSS&A #996 (gondola) and the east side of the Soo Line #99085 (caboose).
  • Applied deck preservative and installed a new covering over the crate on the DM&IR flat car. Moved several pallets of passenger car parts from the Car Shop to the new Storage Building
  • Cleaned and organized the interior of the C&IM business car
  • Continued to work on removing deteriorated sills from under the C&NW #1099
  • Repaired and sealed gaps under the west side wall of the Car Shop
  • Added ballast and sealed the south end doors of the Car Shop
  • Made (3) new display sign bases
  • Made bases for the (2) new donation boxes

Jeff H coating the deck of the D&IR flat car.
Clear coating in process on the DSS&A box car.

Related Links:
Soo Line #2017 Roster Page
CB&Q #1490 Roster Page
KGB&W #76 Roster Page
DSS&A #18052 Roster Page
DSS&A #996 Roster Page
Soo Line #99085 Roster Page
D&IR #5537 Roster Page


At-Home Work

With the pandemic keeping volunteers at home more than normal, many of the volunteers stepped up to work on restoration projects in their home workshops. Following is a list of some the off-site work completed during the year:

  • EJ&S #2: Made, stained and varnished new mahogany window stops (20), made, stained and varnished blind stops (42), Purchased, polished and installed (10) window blind catches, Installed 10 window blind lifts, Finished construction of southeast corner all wood steps and seat castings sent out for machining and de-burring,
  • DULUTH: Restored coach lamp roof vents, restored sleeping compartment berth hardware (in process), and a Barney & Smith corner
  • Goodman #9 Shay: Designed and constructed the rear tool box and restored the Lima gauge lamps
  • LS&I #64: Stencils cut for lettering the car, windows refinished
  • Badger #2 Fish car: Restored the window guards for the car, restored the blind hardware (lifts and springs).
  • DSS&A #701: Stencils developed and cut for the car numbers
  • GN #3261: Machined, de-burred and polished baggage rack
  • Created drawings for the: DULUTH, LS&I #64, Soo Line #203, EJ&S #2 and the Goodman Shay #9.

Fundraising (donations received)

Dailey Foundation, Giving Tuesday, DULUTH Buy-A-Berth and donations to support the Restoration Department projects


Looking ahead to 2021 we look forward to resuming work on the active projects. Unfortunately, funding for the Restoration Department projects will be negatively impacted by the loss of income from the 2020 shut down and the weekend only schedule in 2021. In 2020 the Restoration Department used over $12,000 of designated funds (from savings accounts) and we’ll need your help now to keep the Restoration Department projects moving ahead in 2021! This is where you can really help. I hope you will be able to help the Restoration Department continue to make significant progress in 2021. Won’t you please consider making a generous contribution today?

Donations supporting the Restoration Department can be submitted online or by mail to the MCRM office. Be sure to designate your donation for the “Restoration Department”.




Printable Donation Form (PDF)

Mid-Continent Railway Historical Society
PO Box 358
North Freedom, WI 53951

In closing, many thanks to everyone that volunteered their valuable time and contributed funds towards the restoration work at Mid-Continent in 2020. Have a Happy, Healthy and Safe Holiday and a Happy New Year!!! I’m looking forward to seeing you at Mid-Continent in 2021!! The first 2021 work session will be held on April 3rd.

William Buhrmaster
MCRM Restoration Department

Lantern

Tagged DSS&A DULUTH, DULUTH, EJ&S #2, Goodman Lumber Co #9

DULUTH Restoration 2020 Year-End Progress Report

Mid-Continent Railway Museum Posted on December 18, 2020 by Jeffrey LentzDecember 18, 2020

The DULUTH’s sleeping compartment showing work in progress as well as the veneer headlining panels that have been removed.

In 2020 worked progressed on several fronts on the DULUTH project but the overall progress was less than planned due to the pandemic. The primary focus continues to be working on restoring the 10-section sleeping compartment. The three month shut down at the museum impacted work on site and the off-site contract work on the berths. While the work onsite was negatively impacted progress on projects being worked on by volunteers at their homes proved to be productive. Following is a brief summary of the progress made on the DULUTH sleeping car during 2020. The list includes work performed on the car (at North Freedom), in contractor’s facilities and by MCRM volunteers at their homes.

Fundraising:

  • The “Buy-A-Berth” fundraising campaign that kicked off in 3Q 2019 met its goal in the 1Q of 2020 by raising $25,687.
  • The Giving Tuesday Fundraising Challenge held on December 2, 2020 raised a total of $2,240
  • A total of $10,044 was donated by (19) donors to the DULUTH project in 2020

Berths:

  • Completed the construction of (6) new upper berths
  • Completed the construction of (4) new lower berth seat ends
  • Stripped the old finish off of (4) original upper berths and (2) lower berth seat ends
  • Removed existing sleeping compartment hardware (i.e.: hinges, pulleys, latches, curtains, etc.) from the car for reconditioning
  • Cast and polished replica brass claw feet (Qty. 8) for the seats ends

Four original berths, two from the DULUTH and two from sister car SAULT STE. MARIE undergoing stripping and refinishing in a workshop in Michigan.
One of four existing berths stripped in preraration of being stained and varnished.

Refinishing work on one of the original berths.
One of four existing berths stripped in prepraration of being stained and varnished.

Two of the existing lower berth seat ends stripped in preparation of being refinished.

Sleeping Compartment:

  • Removed the deteriorated veneer headlining (lower roof) panels from inside the car
  • Removed all of the existing seat cushions (backs, bottoms and head rests) from the sleeping compartment of the car
  • Secured samples of missing woodwork and parts that need to be reproduced
  • Cut and fit the prototype berth partition overlay pieces

Duluth lower interior roof after the headlining panel was removed.
Fred B. test fits the berth partition overlay.

Exterior:

  • Removed all of the window sills from the car. The window sills were very deteriorated and in need of complete replacement
  • Removed the wood and vents that covered up the clerestory window openings
  • Began to remove the roof material (rolled asphalt and tar) off of the car. The majority of the wood on the roof deck appears to be in very good condition
  • Removed three of the original oval window frames from the car. These window frames will be used as samples for making a new set (qty. 9) of oval window frames and stained glass inserts

Window sills removed from the DULUTH’s west side.
A portion of the roofing removed off of the DULUTH

David P. works on removing the window sills from the DULUTH’s east side.
Test fitting the oval window template in the DULUTH.

Air Brakes:

  • Finalized the air brake system design
  • Installed the air cylinder in the appropriate location under the car
  • Completed the installation of all of the air piping to the air cylinder
  • Develop prototype levers for the air cylinders

The air cylinder and piping work completed under the DULUTH.
Mike M. moves the DULUTH’s air brake cylinder.

The air cylinder and piping work completed under the DULUTH.
Paul S. installs new piping under the DULUTH.

Hardware:

  • Completed the restoration of the nine oil lamp roof vents
  • Acquired and restored a Barney & Smith corner sink that will be used in the Men’s Smoking Room
  • Acquired an Adams & Westlake two-burner oil lamp for the car
  • Acquired berth hardware from an ex-Milwaukee Road sleeping car in Alberta
  • Sourced a door for the stateroom toilet room
  • Cleaned and restored over 300 pieces of berth and sleeping compartment hardware

Restored and polished window lifts
Restored berth pulley

Restored window curtain hardware.

Men’s Smoking Room:

  • Started to develop the drawings for the missing Men’s Smoking Room walls and partitions
  • Developed the design and size for the missing mirrors (qty.2) to be reproduced

Planning:

  • Developed a detailed list of the sleeping compartment work tasks and sequence of activities
  • Obtained a proposal for reproducing missing wood parts in the sleeping compartment
  • Updated the three year restoration plan
  • Developing a grant request to submit in 1Q 2021

Expenses:

  • Total expenses paid for materials, labor, and contract since Jan. 1, 2020 is $5,448.51

 

Report prepared by William Buhrmaster, MCRM Restoration Department. Dec. 4, 2020.

Related links:

  • Read about the DULUTH’s history on the DULUTH roster page
  • Donate and help the DULUTH reach it’s $75,000 fundraising goal
Tagged DSS&A DULUTH, DULUTH

EJ&S #2 Awarded Grant from Tom E. Dailey Foundation

Mid-Continent Railway Museum Posted on November 13, 2020 by Jeffrey LentzFebruary 24, 2021

Mid-Continent Railway Museum is happy to announce the museum has been awarded a $1,500 grant from the Tom E. Dailey Foundation. This grant will assist Mid-Continent with creating reproductions of the original coach seat design to appear in the historic East Jordan & Southern #2 passenger car, the oldest railcar in Mid-Continent Railway Museum’s collection.

EJ&S No. 2 was originally built in 1864 as coach 112 for the Grand Trunk Railway of Canada. It was purchased in 1902 by the EJ&S and was operated on that railroad until abandonment in 1961. After purchase by a private party, the coach was donated and moved to the Mid-Continent Railway Museum in 1963. Exterior restoration is nearly complete after five years of volunteer work. Attention is now turning to the car’s interior. Blinds and window sash have been reproduced and refinishing of the interior is now in progress.

The next step in the restoration, and the most costly, is the production of replacement seats. Reproduction coach seats are required because all seats were removed when the East Jordan & Southern ended regular passenger service in 1946.

The seat ends are ornate cast iron of a design patented by George Buntin which is different than the seats found in other cars at the museum. Volunteers plan to build the wooden frames for the seatbacks and seat bottoms. Finally, upholstery work will be done professionally by a skilled contractor. This grant from the Tom E. Dailey Foundation will help begin the process of making the seatbacks and bottom cushions. After work on the wooden frames for the seat cushions is completed in 2021, the upholstery will be done in time for seat installation in 2022.

East Jordan & Southern #2 was among the first cars acquired by Mid-Continent Railway Museum and was used as a ticket office during the museum’s first year of operations at North Freedom as seen in this 1963 photo. The car is currently receiving a comprehensive restoration in Mid-Continent Railway Museum’s Car Shop. Ron Jones photo.

ALSO SEE:  Mid-Continent’s Equipment Roster page for EJ&S #2 

Posted in EJ&S #2, News

EJ&S #2 Restoration Update – November 11, 2020

Mid-Continent Railway Museum Posted on November 11, 2020 by Jeffrey LentzDecember 18, 2020

Even with the somewhat shortened restoration work season volunteers made significant progress on No. 2. Starting with the exterior, the west side letter was completed with the filling of screw and nail holes, sanding and priming. The east side letter board required patching, installation, and fabrication of the north end extension which was missing. That was followed by filling, sanding and more priming to complete the letter board. The north end drip boards were also installed.

North end of No. 2 showing new drip boards at edge of roof.
The east side of the EJ&S #2 with the letter board completed.

Three of the four platform steps have been taken apart and are in the process of being rebuilt. Work was also started on cleaning up the trucks. We were surprised to fine remnants of pinning striping probably dating to the 1902 refurbishment by Hicks Locomotive and Car.

North end truck. Note pin striping with the blue tape protecting more.

In the last half of the summer work moved to the interior. The east side wall boards had previously been dismantled. The paint was stripped from the boards and the wall is in the process of being rebuilt.

East side interior. The wall is rebuilt below the window sill and work was started above the window sill.

Much of the paint on the west side wall has also been removed although the wood needs to be cleaned up with chemical stripper. Also work was done on the floor to replace some bad wood and missing boards.

West side interior. Pink primed board is a new replacement.

Finally, all the clerestory windows were removed. The stained glass will be remounted in new frames during the winter months.

I have plenty of work to do a home over the winter. Hopefully we will have more in shop work time next year.

Update provided by Peter Becker

Post navigation

← Older posts
Newer posts →
QUICK LINKS
PLAN YOUR VISIT
BUY TICKETS
GIFT SHOP
DONATE
JOIN OUR EMAIL LIST
VIEW WEBCAMS
Live view of North Freedom depot

Contact Us

Mid-Continent Railway Museum
P.O. Box 358
E8948 Museum Road
North Freedom, WI 53951
Office phone: 608-522-4261
or 800-930-1385
E-mail: inquiries@midcontinent.org

Recent News

  • “Last Spike” Ceremony
  • Engine House Track #2 Update
  • 1385 Steam and Air Line Installation/Donation Update
  • #1385 Cab, Smoke Stack, and Hand Rail Installation/Donation Update
  • Your Help is Needed to Bring the C&NW #1385 Home Again!
©2025 - Mid-Continent Railway Museum - Weaver Xtreme Theme Privacy Policy
↑